Project Info

  • Client Metropolitan Washington Airports Authority
  • Location Dulles, VA

United Airlines Reception Renovation, Washington Dulles International Airport

GES provided MEP & FP engineering services for the new global services reception area.  The design of the new electrical system consisted of provision for a complete new energy efficient LED ambient and accent lighting system as well as space lighting controls system.  The existing area power distribution system was modified to support the new electrical and mechanical equipment provided in the new reception area.  The existing fire alarm system was also modified to accommodate the new space requirements and the new devices were connected to the airport-wide fire alarm system.  The heating, cooling, and air conditioning systems included the modifications to VAV Boxes, duct work, and controls system.  A new sprinkler fire protection system layout was provided and connected to the existing area sprinkler system