Project Info

  • Client Maryland State Highway Administration
  • Location Princess Anne, MD
  • Cost $1.2 M

Princess Anne Maintenance Facility

Under an existing IDIQ Contract, GES provided mechanical, electrical, plumbing, fire protection, fire alarm and life safety engineering design and construction administration services to the State Highway Administration.

GES’ responsibilities included preparing complete plans, specifications and estimates required for the construction of various projects.  Upon completion of this design, GES was also responsible for conducting a pre-bid conference, performing shop drawing reviews, responding to request for information (RFI), site inspections/surveys, completing punch lists and preparing  as-built drawings.  In addition, the team was responsible for studies, life cycle cost analysis, the preparation of reports and assessments, and performing necessary code analysis, thorough field surveys and project management. Representative projects worked under this contract include:

Princess Anne Maintenance Facility – Construction of a new addition, renovation of the entire HVAC system, upgrade of the entire lighting system, code analysis for existing deficiencies and installation of new addressable fire alarm system for the entire facility. Estimated Construction Cost: $1,200,000